FSM · VALUEX

Future-State Design

Design the target flow on top of the current map.

The future-state map designs the flow you want to reach from waste findings and improvement ideas. It starts with one click from a copy of the current state; you reduce inventory, add supermarkets and kanban and rework the processes.

What you gain with VALUEX

  • The current state is preserved; changes on the future state do not affect it.
  • Both states export separately as vector PDFs.

How it works

Copy the current state, put the improvements on the map, measure the gain.

  1. 1

    Start from a copy

    On the Future State tab, take a copy of the map with 'Start from current state'; reduce inventory, add supermarkets and kanban.

    FSM — Start from a copy
  2. 2

    Share the target map

    Download the future-state map as a vector PDF identical to the screen and share it with the team or management.

    FSM — Share the target map

Screens are shown with sample company data; the application interface is in Turkish.

Purpose

To show the path from current to target state in the same language, with the same symbols and the same metrics.

Features

  • 'Start from current state' — a full copy of the map
  • Pull-system design with supermarkets and kanban
  • Current and future state in the same project, on separate tabs
  • Future-state metrics are calculated separately

Benefits

  • The target becomes concrete and measurable
  • Before / after comparison is easy
  • Feeds the kaizen plan directly

Who uses it

Lean transformation teams, production and plant managers, improvement project leaders.

All features

See your value stream in VALUEX

Write to us for a live walkthrough on sample data.

Request a demo
WhatsApp
GURU

GURU · VALUEX assistant

Ask about features, licenses and value stream mapping.

+90 538 390 29 78 info@grupas.com.tr
Hi, I'm GURU! I can answer your questions about VALUEX and value stream mapping (current / future state, lead time, PCE, the 7 wastes).